Winter house decoration consumers do not forget the pipeline "management"

During the winter months, some families tend to experience frozen water pipes, loosely sealed connections, and burst pipes. Therefore, consumers who are renovating in the winter should not neglect the installation of pipelines during the construction process. In houses with poor heating performance, people can also take simple measures to avoid pipeline problems.


Shifeng Plumbing

Decoration

Elbow selected pipe less

Water circuit reconstruction is carried out in the early stage of construction. Experts remind consumers to choose a reliable and reliable decoration company. In the course of waterway reconstruction, use straight pipes as much as possible, use less curved necks, and do not use joints for the parts buried in the walls.

Pipe fittings must find the products of regular manufacturers, and pipes and fittings should use the brand of the same manufacturer as much as possible, so as to ensure more close and firm connection.

Shop pipe fixed firmly

Make sure to do a fixed job when laying pipes. Because sometimes the water pressure suddenly increases, the wall of the pipe tends to fluctuate. If the fixing is not firm, the welding place is prone to problems.

Part of the buried pipe, the pipe inside the slot should also be fixed firmly. There should be a certain distance between the cold water pipe and hot water pipe, usually about 15 cm. Hot and cold water pipes can not be buried in the same slot, otherwise the insulation effect will be discounted.

Water pipe "top not to go"

The principle that should be followed when laying the water pipe is "to go without going." Once the water pipes leak due to aging, low temperature bursts, etc., it is difficult to be found underground until the water seeps downstairs, causing inconvenience to others and temporary remediation. However, the consequences are very serious at this time.

Plumbing to the roof looks like a lot of wasted pipes over the pavement, but once the pipes burst and age, they will soon be discovered. And in repairing, it is not necessary to replan the floor, break the tiles, and use too much of the project, because the kitchen and bathroom are generally aluminum buckle ceiling, just open can quickly find the point of leakage, timely remediation.

Two pressures to prevent leakage

Water pressure needs to be divided into two. After the pipes are laid and fixed, they need to be pressed for the first time. After the pressure is applied, it can be observed with the naked eye and touched by hand to check for leakage. At the same time, pressure should be maintained for more than one hour. After the construction party contacts the owner to check on site, after confirming that there is no problem, it can use cement to backfill the pipe trough.

After the tank is backfilled, it needs to be pressed again before tiling. This time, the construction party will not usually notify the owner. If there is no leakage, he can tiling.

Request waterway plan

In order to facilitate the post-maintenance, consumers must remember to let the constructors issue drawings of the waterway reconstruction, or they can use the camera to photograph the converted waterway. In this way, once the pipe leaks or cracks after the check-in, maintenance personnel can check the hidden dangers according to the drawings as soon as possible, and avoid unnecessary wall or roof removal during maintenance.

Notices Plumbing Purchasing Facade Decoration Interior Decorating Home Decorating Faucet House Decorating Cement Decorating Finding Decoration Company Okay Flooring Tile Kitchen Wall Tiles Bathroom Tiles Bathroom Tiles Color Bathroom Wall Tiles Toilet Ceiling Material Toilet Waterproof Price Toilet Ceiling Toilet Waterproof Toilet Leaking Floor Tile Tiles Price Kitchen tile ld tiles

1 2 Next> Total 2 Page
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

Solar Inverter

Solar Inverter,Power Inverter ,Solar Power Inverter ,Inverter Battery

Solar Energy System Co., Ltd. , http://www.nbsolarenergy.com

This entry was posted in on