pvc floor construction steps master these 5 aspects you are the expert

In recent years, PVC flooring is still widely used in the construction field because it is a new type of light-weight decorative material that is more popular in the world today. In addition to its light texture, it also has many advantages such as anti-skid, fireproof, and waterproof, so it will be popular among people. However, few people know about the construction steps of pvc flooring . Let's analyze it from 5 aspects.

pvc floor construction steps 1, grassroots treatment

After the wall, ceiling, doors and windows are installed, all the debris on the ground must be cleaned. Only after thoroughly removing the sand, dust, remnants and the like on the surface of the base layer, the interface agent can be applied to the ground, and it must be applied evenly.

pvc floor construction step 2, self-leveling construction

Pour the proper amount of self-leveling into a container, and then dilute it with water according to the product instructions, and stir well until the cement is fluid. Then pour the self-leveling on the ground to be constructed in order, and then use the rake tooth scraper to scrape it to a thickness of 2-3mm. Within 4 hours after the completion of the self-leveling construction, it is not allowed to walk on the ground, let alone stack items.

pvc floor construction step 3, pay off

According to the design drawing, the floor specifications and room size are divided and the elastic line is positioned. Then, the center cross or diagonal line is popped on the base layer of the floor, and the parquet block line is popped. However, when playing a border line on the wall, the line must be fine and accurate. In addition, before laying on the floor, dry line, pre-splice, and number the board for the next step.

pvc floor construction step 4, floor installation

Before preparing to start laying the floor, finally clean the ground base. After it is really clean, you can use the tooth-shaped scraper to evenly apply the adhesive to the base layer of the ground; and the plates need to be laid out in order from the inside out, and then one after another is laid, it is recommended to use Press the roller or push plate to compact it.

pvc floor construction step 5, board seam welding

After the board is laid, then the seam welding is needed. However, before welding, not only the dust and debris remaining in the groove should be removed, but also the two adjacent pieces should be cut into V-shaped grooves. In order to make the welding more secure, the opening of the floor should not penetrate the bottom. Finally, after the floor is laid for 24 hours and the glue is fully cured, the entire floor can be cleaned.

Editor's remarks: Well, the construction steps of pvc floor will be explained to you from these five aspects. I believe that after reading the introduction of this article, you should have a clearer understanding of how to lay pvc flooring. In fact, as long as we master the above steps, construction will be much more convenient.

What, the decoration still uses his own money? ! The Qi family is decorated in installments, with an ultra-low annual interest rate of 3.55% and a maximum loan of 1 million. Apply now to enjoy the discount

If you are interested in brand cooperation, content cooperation, and advertising of this website, please send an email to :.

pvc floor construction

Installation Tools

Installation Tools, Line Cutter for Artificial Grass, China Installation Tools

JIANGSU WMGRASS CO., LTD. , https://www.wmgrassturf.com

This entry was posted in on