After the ball mill is installed and passed the inspection, the empty car test run can be carried out. The commissioning of the ball mill should be carried out by a skilled ball mill operator and strictly follow the safe operating procedures of the ball mill. Here is a brief introduction to the method of ball mill test run. (1) The continuous operation time of the air operation shall be no less than 12-24 hours, and problems shall be solved in time during operation. (2) The load test operation can be performed normally when the dry running test machine is normal. The load test run should be carried out in stages. Feeding should be carried out according to the discharge condition during load operation to avoid unnecessary wear and damage of the steel ball and the cylinder liner. 1. Add the appropriate material and 1/3 of the steel ball (maximum ball loading see the general plan of the ball mill) for 12-24 hours. 2. Add 2/3 of the steel ball for 24-48 hours. 3. According to the ball mill discharge condition, the output of qualified products, with reference to the actual ball loading of the ball mill of the same type of concentrator, determine the reasonable ball loading of the billiard mill, and carry out the test run of not less than 72 hours. (3) The increase of the above-mentioned load amount and the length of the test run time are determined based on the running condition of the large and small gears and the reducer gear (temperature rise, noise, tooth surface contact, etc.). Do not operate at full capacity until the tooth surface contact accuracy does not meet the design requirements. (4) During the test operation, the cooling and lubrication system should work normally. The temperature of the main bearing, transmission bearing and reducer should be normal. (5) After loading the 2/3 number of steel balls for 24-48 hours, check and tighten all the bolts again. (6) The test operation must be done carefully. Contact phone Juxin Machinery: E broken machine: http://Product/SuiShi/20120815/1501.html Box crusher: http:// Double-tooth roller crusher: http:// Shredder equipment: http:/ / High-efficiency fine crusher: http:// mobile shredder: http:// Slime dryer: http://hgj.hnjuxin.com/Products/mnhgj.html Three-pass dryer: http:// Hgj.hnjuxin.com Vertical dryer: http:// Desulfurization gypsum dryer: http://Product/XiXuan/20161027/2498.html Sand production line: http:// River pebble sand machine: http: //zhishaji.xyjuxin.com Small sand making machine: http://Product/ZhiSha/20120901/1478.html New sand making machine: http://Product/ZhiSha/20170618/2615.html Ball mill: http:// Construction site Car washing machine: http://http://xicheji.xyjuxin.com/xwdt/http://news.chinawj.com.cn
We diviided the led light according to the using eviiroment. Most of our product is the commercial LED Lighting
Commercial lighting is a term used to describe lighting that is used in commercial spaces, including auto dealerships, distribution centers, churches, factories, offices, and warehouses. Unlike residential lighting, commercial lighting is made to withstand more abuse and has a longer lifespan.
While the focus of residential lighting is often on aesthetics, commercial lighting is task orientated. Commercial lighting systems are designed based on what the application is. For example, in an office-type setting, you may see task lighting, which illuminates specific areas where employees need concentrated light to be able to perform their jobs.
Outdoor Led Flood Light Bulb,Solar Led Flood Light,Led Flood Light Bulb Outdoor,Led Flood Lights Outdoor
Jiangmen Dilin Lighting High-Tech Co., Ltd. , https://www.jmdilinlighting.com