The walls of those tricky, the owner must look at the wall decoration standards

The walls seem to be an extremely simple thing, but in actual operation, it is not difficult for us to find that this is also a lot of cats, and Xiao Bian tells everyone the principle of wall masonry, let everyone Can accurately supervise the work, but also can be done in the process of building their own walls. 1. At the beginning of the wall-building work, we first need to build a solid base layer, remove all surface impurities, and sprinkle water on the ground to wet the ground, so as to strengthen the connectivity between our wall ground. 2. In the process of building walls, the preparatory materials preparation requirements for the pre-decoration period are also extremely stringent. We need to allocate the most appropriate proportion of cement mortar, which is generally determined to be three to one, and the cement number must not be lower than 325. We also need to make sure that all bricks are intact and free of cracks to ensure the strength of our walls. 3. In the concrete wall building process, we should strictly abide by the standards on the decoration drawings, carefully check all the wall areas and the space dimensions, and find that mistakes need to be corrected so as to prevent the subsequent work from being carried out. 4. If we need to connect the old and new walls in the process of building a wall, then inside the two walls connected, a 6 mm thick L-shaped steel bar with a length of not less than 40 cm must be placed every 60 cm. The anchoring glue is used for secondary fixation. Outside the wall connection point, we need to lay a wire mesh with a width of not less than 15 cm to enhance the tightness of the connection between the two. 5. In the process of kitchen and bathroom renovation, we also need to build a floor beam, which has to destroy the original waterproof layer. However, when building it again, cement should not be laid directly on the waterproof layer. Otherwise, it may be. It will cause serious water leakage. 6. When constructing a wall, everyone needs to prepare a lead sinker and a level rule at any time. Every cubic meter will be measured at a distance to ensure that the verticality and flatness of our wall are within 4 millimeters. The vertical contact points must maintain a 90-degree right-angled shape, and all dimensions must strictly comply with the accurate data for engineering acceptance. 7. In addition, if it is necessary to reserve the position of doors and windows on the wall, we must measure the specifications of the entire door and window in advance, and plan their size and position on the design drawings so as to avoid the phenomenon of repeated construction during the actual decoration process. Making the whole wall work difficult.

Mud stage

Infrared Thermometer

Digital Infrared Thermometer,Non Contact Infrared Thermometer,Non Contact Medical Thermometer,No Contact Infrared Thermometer

Ningbo Autrends Prevention Products Co., Ltd , https://www.autrendsafety.com

This entry was posted in on