In our modern living environment, home improvement has entered our lives, but there are many aspects of home improvement that need to be considered. After the renovation, whether the layout of strong and weak electricity is perfect, whether the waterproof effect of the home has reached the standard, can normal use, waterproof bathroom floor cracks between the blocks is a very important project, here we come to a simple look at how to waterproof cracks between the blocks of the inter-health and what precautions.
One: how to do waterproof bathroom floor tiles
1: The first step is to carry out the cleaning work of the bathroom. When the leakage method of the tile surface of the bathroom is not damaged, we have to empty the toilet debris, and the surface dust and stains will have water accumulation. Clean up the dirt and keep the surface dry.
2: Next we will clean the gap of the tile. If the tile seam is filled with caulking agent or other non-waterproof material, we need to use a wallpaper knife to draw a small groove and then clean it up. The gap is small or the solidified seam is no longer necessary to buckle the gap.
3: Then we can spray waterproofing agent, spray the permeable waterproofing agent on the surface of the tile, the gap of the tile, and must make the uniformity of the spray. Remember that wall joints and root canals, cement and other parts must also be sprayed.
4: Secondly, we need to use caulking paste for caulking. After the water repellent is almost completely dry, we use the caulking paste to fill the tile joints. There will be root canals and some walls that can let people get wet. Seam. In the link, the plastic steel mud is used for waterproof sealing, and the bonding is firm and strict.
6: After all the construction is completed, the toilets are forbidden to be used and used within 24 hours, and all the construction materials can reach the dry effect before use.
Two: What should we pay attention to when making waterproof and waterproof bathroom?
1: The floor of the bathroom should be flat. If you want to replace the floor tiles of the bathroom before waterproofing, then when removing the original floor tiles, you must use cement slurry to level the ground, how to do the next waterproof treatment. Leakage caused by the inconsistency in the density of the waterproof coating is avoided.
2: When spraying waterproof material, the sprayed parts must be sprayed in place, and the gap between the bathroom wall and the ground is the most prone to problems. Therefore, the construction personnel must carry out on-site supervision and inspection during construction, and the corners of the corners Smear must be rigorous.
3: After the construction is completed, it is necessary to carry out a waterproof test on the room under construction to ensure the integrity of the waterproof construction and no other problems in the future use.
4: Be sure to clean the floor drain, as well as the pipeline at any time, to achieve smooth flow, so that the waterproof effect can be achieved at all.
5: The most important thing is the waterproof layer of the wall, because when using the bathroom, the water on the wall is also very large, so we have to spray the waterproof coating on the wall, which will not cause the wall to accumulate. The phenomenon of water infiltration occurs.
I briefly introduced the need to pay attention to the waterproof construction of the bathroom floor tiles, and how to introduce the waterproof construction of the floor tiles of the bathroom. I believe that there are some help for everyone, and the attention during the construction process. The matter is very important. If you want to know more about home improvement information, please continue to pay attention to the decoration home network.
More related wonderful reading:
Bathroom floor tile joint waterproof method bathroom floor tile joint waterproof point
Solar Street Light,Led Street Light,Led Street Garden Lamp,High Power Led Street Light
JIANGMEN MOSCOT OPTOELECTRONIC TECHNOLOGY CO.,LTD. , https://www.jmsensorsled.com