1. When the ambient temperature is 25 °C, it should be 2-3 days after construction, that is, the hardness reaches about 80% of the completion of curing;
2, the surface can not appear sticky;
3, air bubbles: flat coating type, mortar type without bubbles, self-leveling allows 1 small bubble / 10 square meters;
4, good leveling, no knives, large-area interface is basically flat;
5, no floating color, uniform color, large-area interface allows for extremely inconspicuous color difference;
6, no coarse impurities, but allow the floating dust in the air to fall into the smallest defects caused;
7, the surface of the floor should be smooth and smooth, the gloss should meet the design requirements (high gloss ≥ 90, light ≥ 70, half light 50 ~ 70), flat coating type is light, water is semi-gloss ~ no light;
8, orange peel, mortar anti-slip surface effect should be very obvious.