The common methods for installing tile presses include the overall lifting method, the high-altitude sliding method, and the overall lifting method. The following describes each of these installation methods in detail.
1. The overall lifting method of the installation of tile press equipment The overall lifting method refers to the construction method of installing lifting equipment on the structural column and lifting the assembled network frame in place on the ground. The lifting equipment used in the overall lifting method of the grid is generally relatively small, such as a riser, a hydraulic sliding mode jack, etc., and the use of a small cluster to install a large grid, the lifting equipment is small, and the cost is low. The supporting condition of the lifting stage network frame is the same as that of the use stage. It is not necessary to consider the upgrading stage to add reinforcement measures, which is more economical than the overall lifting method. The lifting capacity of the lifting equipment has a greater range of options. The roof, waterproof layer, ceiling, heating and ventilation of the grid can all be constructed on the ground and at the most favorable height, thereby greatly saving construction costs. The overall lifting method of the grid can only rise vertically in the design coordinates and cannot move or rotate the grid. Caigang presses the whole lifting method applicable to the surrounding support and multi-support grid. The focus of construction is on the control of synchronous lift and the control of aerial displacement of the grid.
2. Upper-air sliding method for installation of tile press equipment Upper-air glide method refers to the installation method in which the slitter press units are single-sliding (one-by-one) to the design position and spliced ​​into a whole on a pre-set slide rail. Because the grid in the upper-air slip method is an overhead operation, there is no impact on the internal construction of the building. The installation of the grid and the construction of the lower part can be carried out in three-dimensional operations in parallel, accelerating the construction schedule, shortening the construction period, and eliminating the need for large-scale equipment and traction equipment. The high-altitude sliding method is applicable to the sliding unit grids that can be divided into geometrically invariable systems, such as square pyramids, square pyramids with positive evacuation, and orthogonal orthogonal grids with two directions. It is particularly applicable to the case of crossing construction and the need for three-dimensional cross construction using the above-mentioned grid. The focus of construction is the control of the slipping unit's synchronous slip.
3. The overall hoisting method of the installation of the tile press equipment The integral hoisting method refers to the construction method of hoisting the grid in place after lifting the grid frame on the ground. The welding and splicing of the entire grid is carried out on the ground, and it is easy to guarantee the construction quality. Since the entire grid is in place solely by lifting equipment, the lifting equipment's ability and control of lifting movements are particularly important. The integral hoisting method is suitable for all types of grids when the site and lifting equipment allow it. The focus of construction is the control of the simultaneous rise of the grid and the control of the displacement of the grid in the air.
Contact person: Yin Zhaoyu Tel: (WeChat) 13930723092; 13785767943 QQ; 3107482793
Address: 200 meters east of Shuangshi Zhao Credit Co., National Road 104, Botou City, Hebei Province
1. The overall lifting method of the installation of tile press equipment The overall lifting method refers to the construction method of installing lifting equipment on the structural column and lifting the assembled network frame in place on the ground. The lifting equipment used in the overall lifting method of the grid is generally relatively small, such as a riser, a hydraulic sliding mode jack, etc., and the use of a small cluster to install a large grid, the lifting equipment is small, and the cost is low. The supporting condition of the lifting stage network frame is the same as that of the use stage. It is not necessary to consider the upgrading stage to add reinforcement measures, which is more economical than the overall lifting method. The lifting capacity of the lifting equipment has a greater range of options. The roof, waterproof layer, ceiling, heating and ventilation of the grid can all be constructed on the ground and at the most favorable height, thereby greatly saving construction costs. The overall lifting method of the grid can only rise vertically in the design coordinates and cannot move or rotate the grid. Caigang presses the whole lifting method applicable to the surrounding support and multi-support grid. The focus of construction is on the control of synchronous lift and the control of aerial displacement of the grid.
2. Upper-air sliding method for installation of tile press equipment Upper-air glide method refers to the installation method in which the slitter press units are single-sliding (one-by-one) to the design position and spliced ​​into a whole on a pre-set slide rail. Because the grid in the upper-air slip method is an overhead operation, there is no impact on the internal construction of the building. The installation of the grid and the construction of the lower part can be carried out in three-dimensional operations in parallel, accelerating the construction schedule, shortening the construction period, and eliminating the need for large-scale equipment and traction equipment. The high-altitude sliding method is applicable to the sliding unit grids that can be divided into geometrically invariable systems, such as square pyramids, square pyramids with positive evacuation, and orthogonal orthogonal grids with two directions. It is particularly applicable to the case of crossing construction and the need for three-dimensional cross construction using the above-mentioned grid. The focus of construction is the control of the slipping unit's synchronous slip.
3. The overall hoisting method of the installation of the tile press equipment The integral hoisting method refers to the construction method of hoisting the grid in place after lifting the grid frame on the ground. The welding and splicing of the entire grid is carried out on the ground, and it is easy to guarantee the construction quality. Since the entire grid is in place solely by lifting equipment, the lifting equipment's ability and control of lifting movements are particularly important. The integral hoisting method is suitable for all types of grids when the site and lifting equipment allow it. The focus of construction is the control of the simultaneous rise of the grid and the control of the displacement of the grid in the air.
Contact person: Yin Zhaoyu Tel: (WeChat) 13930723092; 13785767943 QQ; 3107482793
Address: 200 meters east of Shuangshi Zhao Credit Co., National Road 104, Botou City, Hebei Province
Hose Squeeze Peristaltic Pump,Peristaltic Tubing,Industrial Peristaltic Pump,Micro Peristaltic Pump
Hengshui Yuanhan Trading Co.,Ltd , https://www.hengshuiyuanhanpump.com