Blank room acceptance notice rough room decoration experience

The embryo house is a house that has just been delivered to a house that is not renovated. This house has only a door frame and no door, and the wall surface has only a simple treatment. In the real estate market, the embryo house still occupies the main position. However, the acceptance of the embryo house before the house is submitted is still required. Then, the next small series for everyone to introduce rough housing acceptance considerations and rough room decoration experience.

Blank room acceptance considerations

1. First, the acceptance of the flatness of the wall shall be checked, whether water seepage, whether there is a crack, etc.

2. Check the doors and windows of the embryo house and whether the balcony cracks.

3. Check whether the hydropower gas in the embryo house is unobstructed.

4. Check whether there are any cracks or empty shells in the embryo house.

5. Check whether the water in the embryo house is unobstructed.

6. Check the height of the embryonic house floor, the number of water and electricity tables, the record, the size of the Shower Room, etc.

Blank room decoration experience

First, prepare rough house decoration tools

Before the renovation, prepare a tape measure, a calculator, and a large plate clamp;

Second, check

Check the waterproof condition of the embryo house and observe whether the house corners will seep. This is a very critical issue. If problems arise, it is necessary to find the properties in time.

Third, choose the start of auspicious days

Before the renovation, you must choose a good starting date. Then, before the construction, it is best to measure the original corners once again, and make good records. Don't be lazy. Determine the area, tiling area, spray area, and wallpaper. If you have custom furniture, you should also count the height and width.

Fourth, the demolition of the main body, so that space is more practical

The transformation of the main body is one of the more important items for renovation. It mainly includes wall removal, wall cladding, shovel wall covering, demolition of heating, and so on. The dismantled garbage shall be cleared in time to ensure the cleanliness of the interior and facilitate the subsequent construction. In addition, you can set the finished door, it is best to walk through the cabinets, hood, stove, water heater, and can be determined.

Fifth, pack the tube, tiling

The bathroom is a very humid area. The material of the standpipe must not be wood keel, even if it is painted on the wooden keel. It is best to use light steel keels, or red bricks. Light steel keel provinces, but the most solid and easy to use is the red brick.

Sixth, reload

For some defective places need to re-install

Seventh, the renovation of rough houses should pay attention to the hydropower reform and arrange the use of each space.

The installation location of hydropower must be determined well, but also to see the master at the scene to do, and then personally accepted, otherwise the problem would be troublesome. Before making hydropower, measures need to be taken to determine the power supply and waterway solutions.

Editor's summary: The rough room acceptance notice and rough room renovation experience are introduced here and hope to be helpful to everyone. Want to learn more related knowledge can focus on this site information.

Blank house blank room decoration budget

Sanitary Ware

Castel sanitary ware products is the best seller at home and abroad with high quality and full range bathroom&kitchen products. it has bathroom Cabinet , acrylic Bathtub , Toliet , Mirror ,ceramic Wash Basin, kitchen tap, bathtub Faucet , Shower enclosure,shower room,urinal,tower rack,handrail,soap holder and Floor Drain etc. We can offer one-stop bathroom and kitchen products.

Bathroom Sanitary Ware,Bathroom Shower Room,Ceramic Wash Basin,Bathroom Cabinet Vanities

Foshan Castel IMP&EXP Co.,Ltd , https://www.fscastel.com

This entry was posted in on